Phoenix Local Policy Brief • Interactive Prototype
How Phoenix manages a 30% CAP reduction through banked reserves, Stage 2 pricing, and $3.17B in water infrastructure
Drag the slider to test how cuts to Central Arizona Project (CAP) deliveries affect citywide potable supply (~1.7M residents served).
At a 30% CAP cut, North Phoenix bears the direct delivery shift, bridged via four operational levers:
Key public administration takeaway for this scenario:
Inside-city 5/8" meter using official March 2025 rates + proposed Stage 2 drought surcharge ($2.10/unit above 20 units/mo).
Residents often blame “the City” for drought shortages or suburban sprawl. Click each tier to see actual legal authority and constraints.
Approved FY 2025–26 & Proposed FY 2027–31 enterprise capital allocations (ratepayer & revenue-bond funded, not General Fund taxes).
12 mi of 66" pipe + 3 booster stations move Salt/Verde water to N. Phoenix.
Rehabilitation & purification buildout begins; federal ROD finalized.
1.25 MAF Lower Basin cuts begin; Phoenix enters Stage 2 Water Warning.
Cave Creek Pure Water delivers ~7 MGD (~25,000 homes) after 1-yr demo.
91st Ave & North Gateway AWP bring Pure Water Phoenix past 50,000 AF/yr.